A yard sized for volume
Seven bay doors and a 14-acre fenced yard let the Midland team stage equipment for high-volume drilling programs without waiting on space.
Permian Basin

S3S has worked the Permian Basin since 2011. In April 2022 the Midland team moved onto a 14-acre fenced yard with seven bay doors, a wash bay, and a mud and data lab with full PSA and PSD capability, plus living quarters for crews staying on site. From here S3S supports drilling programs across West Texas and Southeast New Mexico.
Midland facility
S3S moved onto a 14-acre fenced yard in Midland on April 30, 2022, up from five acres, with seven bay doors, one wash bay, a mud and data lab with full PSA/PSD capability, and living quarters for up to a dozen employees. Read more about the new Midland facility. Call the office or get directions to reach the team.

Midland supports high-volume drilling programs across West Texas and Southeast New Mexico. A documented Midland Basin installation, three MudCubes and one 19-inch-bowl centrifuge, processed 100% of the volume below the flowline shakers and cut diesel consumption 43%, saving the customer $39,000 per well on that project.
Seven bay doors and a 14-acre fenced yard let the Midland team stage equipment for high-volume drilling programs without waiting on space.
The Midland lab runs full PSA and PSD testing on site, so fluid and solids data comes from the yard, not a courier.
Living quarters for up to a dozen employees keep crews close to the equipment during extended programs.
Field results
A Midland Basin case study using three MudCubes and one 19-inch-bowl centrifuge recorded the following results. These are project-specific results, not a promise of future performance.
The case study reports that all volume below the flowline shakers was processed through the MudCube system.
The documented installation reduced diesel consumption by 43%.
The documented configuration saved the customer $39,000 per well.
Built for the Permian
A Midland Basin project running three MudCubes and one 19-inch-bowl centrifuge processed all of the volume below the flowline shakers, cut diesel consumption 43%, and saved the customer $39,000 per well. It is one project, not a standard result, but it shows how the pieces work together on a Permian location.
The documented installation ran MudCube screens on 100% of the volume below the flowline shakers before it moved further downstream.
Pairing the MudCubes with a 19-inch-bowl centrifuge reduced diesel consumption by 43% on that installation.
The same configuration saved the customer $39,000 per well, a project-specific result tied to that fluid program and site.
Every Permian location has its own fluid system and drilling plan. The Midland team reviews both before recommending equipment.
Work with S3S
Share the drilling location, fluid system, and timing. The Midland team will scope the solids-control equipment your program in West Texas or Southeast New Mexico needs.
What happens next